Civic infrastructure

Sewer overflowing or no sewer connection

A sewer line is overflowing, or a house or street has no sewer connection; PHED and the local body share responsibility depending on the area.

Last verified: 2026-09-26

ConditionalRevenue circleLast verified: 26 Sept 2026

Start here

Report an overflowing or damaged sewer line to the Public Health Engineering Department subdivision office, and a missing house connection to the municipal body.

Who is responsible

  • Executive Engineer (Public Health Engineering)PHED field engineer responsible for water supply, hand pumps, treatment plants and sewerage in a subdivision in Bihar.
  • Public Health Engineering Department, BiharDrinking water supply, hand pumps, treatment plants and sewerage in rural and urban Bihar; rural scheme is delivered under the Jal Jeevan Mission.

A trunk sewer and a house connection are two different things: the trunk line and treatment are PHED's responsibility, while the house connection and the street sewer in a municipal area are handled by the municipal body. Reporting whether the problem is a blocked main or a missing house tap decides who acts.

Important condition: Sewerage networks are laid differently in different cities, and some colonies are still on septic tanks; confirm whether a sewer exists at your location before reporting a missing connection.

The ladder to Patna

Set your district to see local office numbers

  1. You

    Your home, village, or ward — where the problem is.

  2. Start here

    Report an overflowing or damaged sewer line to the Public Health Engineering Department subdivision office, and a missing house connection to the municipal body.

  3. Revenue circle

    Executive Engineer (Public Health Engineering)

    PHED field engineer responsible for water supply, hand pumps, treatment plants and sewerage in a subdivision in Bihar.

  4. State

    Public Health Engineering Department, Bihar

    Drinking water supply, hand pumps, treatment plants and sewerage in rural and urban Bihar; rural scheme is delivered under the Jal Jeevan Mission.

  5. State

    Government of BiharPatna · state headquarters

    State government; departments deliver citizen services through ServicePlus and department portals.

If that does not work

  1. 1

    Report the blocked or overflowing line to the subdivision office

    Open official page
  2. 2

    For a house connection, apply through the municipal body

    Open official page
  3. 3

    No desilting after a month, escalate in writing to the district PHED office

    Open official page
Sources and evidence
  1. [1] Public Health Engineering Department, BiharThe Public Health Engineering Department is responsible for water supply and sewerage services in Bihar.
  2. [2] The Bihar Municipal Act, 2007Drains and sanitation are municipal functions under the Bihar Municipal Act.
Report a correction